Prepare the Surface
Surface preparation is one of the most important steps in the tile installation process. An insufficient substrate is the most common cause of failure when bonding to building surfaces.
- Check for holes or voids
- Make sure the surface is flat and even
- Waterproof areas exposed to water
Patch Surface Voids
Use for patching, smoothing and filling holes, cracks, voids and depressions before installing floor coverings.
Level Surface
Results in a smooth finished surface ideal for the installation of all types of floor coverings.
Waterproof & Prevent Cracks
Forms a smooth, watertight surface over walls, floors and ceilings.
-
-
Fast Setting Patch
Fills voids up to 1/2" deep, leaving a smooth finish. Install floor coverings in as little as 30 minutes.
-
-
-
Self Leveling Underlayment
Easy pour application seeks its own level. Prime surfaces with Self Leveling Underlayment Primer.
-
Self Leveling Underlayment Primer
Designed for use with TEC Skill Set™Self Leveling Underlayment.
-
-
-
Waterproofing and Crack Prevention Membrane
Waterproof areas exposed to water and prevent cracked tiles.
-