Learn how to lay tile with high quality tile installation products

Step 1

Prepare the Surface

Surface preparation is one of the most important steps in the tile installation process. An insufficient substrate is the most common cause of failure when bonding to building surfaces.

  • Check for holes or voids
  • Make sure the surface is flat and even
  • Waterproof areas exposed to water 

Patch Surface Voids

Use for patching, smoothing and filling holes, cracks, voids and depressions before installing floor coverings.

Patch Surface Voids

Level Surface

Results in a smooth finished surface ideal for the installation of all types of floor coverings.

Level Surface

Waterproof & Prevent Cracks

Forms a smooth, watertight surface over walls, floors and ceilings.

Waterproof and Prevent Cracks
    • Fast Setting Patch

      Fills voids up to 1/2" deep, leaving a smooth finish. Install floor coverings in as little as 30 minutes.

    • Self Leveling Underlayment

      Easy pour application seeks its own level. Prime surfaces with Self Leveling Underlayment Primer.

    • Self Leveling Underlayment Primer

      Designed for use with TEC Skill Set™Self Leveling Underlayment.

    • Waterproofing and Crack Prevention Membrane

      Waterproof areas exposed to water and prevent cracked tiles.